Close Menu
    Facebook LinkedIn
    Geo365
    Facebook LinkedIn
    BESTILL Login ABONNÉR PÅ NYHETSBREV
    • Hjem
    • Anlegg og infrastruktur
    • Aktuelt
    • Bergindustri
    • Dyphavsmineraler
    • Miljø
    • Olje og gass
    • Geofunn
    • Download Media Guide
    Geo365
    You are at:Home » 6,100km2 of new data in the Hammerfest Basin
    Olje og gass

    6,100km2 of new data in the Hammerfest Basin

    By Press Releasemai 29, 2018
    Del denne artikkelen Facebook Twitter LinkedIn Email
    TGS and Petroleum Geo-Services ("PGS") announce a new multi-client project in the Barents Sea.
    Ramform Atlas Foto: PGS

    Ramform Atlas Foto: PGS

    Facebook Twitter LinkedIn Email

    The new Nansen 3D Geostreamer® survey will cover ~6,100 km² in an active APA area of the Hammerfest Basin. Acquisition is expected to commence late May and is due to be completed in September 2018. 

    The project is designed to improve the imaging of the known fields and discoveries, and allow identification and development of new targets in both mature and new plays. The survey area contains shallow targets on the basin flanks and platforms, with deeper exploration potential elsewhere in the basin.

    The Hammerfest Basin dataset further expands PGS’ MultiClient GeoStreamer coverage in the Barents Sea, applying true broadband technology to reveal the full potential of the area. The Hammerfest Basin is already producing hydrocarbons and is highly relevant for further exploration in the current and upcoming APA rounds, PGS writes in a press release.

    «In addition to providing an excellent basis for exploration decisions, this new Hammerfest dataset can be used as a baseline survey for future 4D comparisons, making this a cost-effective solution for exploration, evaluation, field development and production monitoring,» said Rune O. Pedersen, President & CEO of PGS.

    «Nansen 3D will expand TGS’ data coverage in the Barents Sea where we have a strong track record of success. This project will provide modern, high quality seismic data to an area that is highly relevant for exploration in the current and upcoming APA rounds,» said Kristian Johansen, CEO, TGS.

    The project configuration employs an intelligent towing scheme to maximize resolution. PGS’ Ramform Atlas will tow an ultra-high-density 3D configuration with a 16 x 56.25 m x 7,000 m setup. Three of the streamers are towed with 10 km offsets for optimized performance of full waveform inversion (FWI). The acquisition design is tailored to fully utilize the potential of an advanced PSDM and FWI processing workflow.

    Data processing will be performed by TGS using its Clari-Fi(TM) broadband technology. Fast-track data will be available in Q1 2019 with final data in Q4.

     

    Related Posts

    Mange år (og fat) gjenstår

    mars 18, 2026

    Fant mer olje i Tubåen

    mars 18, 2026

    Tempoet må opp

    mars 16, 2026
    Add A Comment

    Comments are closed.

    NYHETSBREV
    Abonner på vårt nyhetsbrev
    geo365.no: ledende leverandør av nyheter og kunnskap som vedrører geofaget og geofaglige problemstillinger relatert til norsk samfunnsliv og næringsliv.
    KONFERANSER

    Knytter mineralfunn til Framstredets åpning
    Mar 31, 2026

    Knytter mineralfunn til Framstredets åpning

    Asteroidenedslag: Mjølnirkrateret
    Mar 30, 2026

    Asteroidenedslag: Mjølnirkrateret

    Zero-waste processing of deep-sea minerals
    Mar 24, 2026

    Zero-waste processing of deep-sea minerals

    Seabed mining – life recovers
    Mar 20, 2026

    Seabed mining – life recovers

    Havet endret seg brått rundt 1950 
    Mar 18, 2026

    Havet endret seg brått rundt 1950 

    Offshore Algarve Basin geological carbon storage potential
    Apr 02, 2026

    Offshore Algarve Basin geological carbon storage potential

    From the shores of Lake Geneva to NEOM in Saudi
    Apr 01, 2026

    From the shores of Lake Geneva to NEOM in Saudi

    Grand plans, challenging geology
    Mar 31, 2026

    Grand plans, challenging geology

    How to generate an oil accumulation in a gas-prone petroleum system?
    Mar 30, 2026

    How to generate an oil accumulation in a gas-prone petroleum system?

    Norway’s AlphaGo moment: Why 2025 changed the game
    Mar 27, 2026

    Norway’s AlphaGo moment: Why 2025 changed the game

    OLJEPRIS
    BCOUSD quotes by TradingView
    GULLPRIS
    GOLD quotes by TradingView
    KOBBERPRIS
    Track all markets on TradingView
    GeoPublishing AS

    GeoPublishing AS
    Trollkleiva 23
    N-1389 Heggedal

    Publisher & General Manager

    Ingvild Ryggen Carstens
    ingvild@geopublishing.no
    cell: +47 974 69 090

    Editor in Chief

    Ronny Setså
    ronny@geopublishing.no
    +47 901 08 659

    Media Guide

    Download Media Guide

    ABONNEMENT
    NYHETSBREV
    Abonner på vårt nyhetsbrev
    © 2026 GeoPublishing AS - All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.