Close Menu
    Facebook LinkedIn
    Geo365
    Facebook LinkedIn
    BESTILL Login ABONNÉR PÅ NYHETSBREV
    • Hjem
    • Anlegg og infrastruktur
    • Aktuelt
    • Bergindustri
    • Dyphavsmineraler
    • Miljø
    • Olje og gass
    • Geofunn
    • Download Media Guide
    Geo365
    You are at:Home » Statoil submits PUD for Trestakk
    Olje og gass

    Statoil submits PUD for Trestakk

    By Press Releasenovember 1, 2016
    Del denne artikkelen Facebook Twitter LinkedIn Email
    On behalf of the license holders submitted the PUD of the Trestakk discovery on the Halten Bank to Tord Lien, minister for petroleum and energy.
    Illustrasjon: Utgard Field Development © Statoil ASA
    Facebook Twitter LinkedIn Email

    Leverte utbyggingsplan for Trestakk
    Capital expenditures are estimated at approximately 5.5 billion NOK.
    The discovery, made in 1986, contains about 76 million barrels of recoverable oil equivalent, mainly oil. The project will be tied back to the Åsgard A oil production vessel, with planned production startup anticipated in 2019.
    “Trestakk is a good example of what is possible to achieve through spending time on working toward the best concept selection. By rethinking our concept along with license partners and suppliers, we have arrived at a solution that costs almost 50 percent less than the original concept. At the same time, we have been able to increase the recoverable resources significantly,” says Torger Rød, head of project development in Statoil.
    The first investment estimates were around 10 billion NOK, which was reduced to 7 billion NOK when the concept selection was made in January 2016.
    Additional improvements and concept adaptations this year further reduced the estimates to about 5.5 billion NOK.
    The concept selection consists of a template structure and an attached satellite well, which will be tied back to Åsgard A. Three production wells and two gas injection wells will be drilled for a total of five wells.
    “Volumes from Trestakk are an important contributor to ensure that operations on the Åsgard A production ship are extended toward 2030 and that more of the original volumes from the Åsgard field can be extracted,” says Siri Espedal Kindem, senior vice president for operations North in Statoil.
    The reductions have been achieved through rethinking concept, simplifying and reducing scope in addition to capitalizing on recent efficiency improvement initiatives.
    “This shows what we, as an industry, have managed to achieve in just a few years’ time. The Norwegian supplier industry has in recent years shown a great ability to find good, cost-effective solutions that have made it possible to realize projects such as Trestakk, even though the oil price is low,” says Rød.
    Pressemelding

    Related Posts

    Energisikkerhet over klimamål

    juli 21, 2026

    Carmen snevres inn

    juli 9, 2026

    Vurderer CO2-lagring ved Wisting

    juli 4, 2026
    Add A Comment

    Comments are closed.

    NYHETSBREV
    Abonner på vårt nyhetsbrev
    geo365.no: ledende leverandør av nyheter og kunnskap som vedrører geofaget og geofaglige problemstillinger relatert til norsk samfunnsliv og næringsliv.
    KONFERANSER

    Kosmisk stråling: Siggjo, Sunnhordland
    Jul 23, 2026

    Kosmisk stråling: Siggjo, Sunnhordland

    Tidlig oljeutdrivning betyr ikke prospektivitet
    Jul 21, 2026

    Tidlig oljeutdrivning betyr ikke prospektivitet

    En flamme som brenner evig 
    Jul 16, 2026

    En flamme som brenner evig 

    Slik så Norge ut i trias
    Jul 14, 2026

    Slik så Norge ut i trias

    Et spektakulært himmelfenomen
    Jul 09, 2026

    Et spektakulært himmelfenomen

    The next step for National Data Repositories
    Jul 29, 2026

    The next step for National Data Repositories

    The increasing importance of DHI’s in the Rotliegend play of the Southern North Sea
    Jul 28, 2026

    The increasing importance of DHI’s in the Rotliegend play of the Southern North Sea

    The reservoir will always have its final say
    Jul 27, 2026

    The reservoir will always have its final say

    Guinea-Conakry: From quiet frontier to regional contender
    Jul 24, 2026

    Guinea-Conakry: From quiet frontier to regional contender

    The class of ’71
    Jul 24, 2026

    The class of ’71

    OLJEPRIS
    BCOUSD quotes by TradingView
    GULLPRIS
    GOLD quotes by TradingView
    KOBBERPRIS
    Track all markets on TradingView
    GeoPublishing AS

    GeoPublishing AS
    Trollkleiva 23
    N-1389 Heggedal

    Publisher & General Manager

    Ingvild Ryggen Carstens
    ingvild@geopublishing.no
    cell: +47 974 69 090

    Editor in Chief

    Ronny Setså
    ronny@geopublishing.no
    +47 901 08 659

    Media Guide

    Download Media Guide

    ABONNEMENT
    NYHETSBREV
    Abonner på vårt nyhetsbrev
    © 2026 GeoPublishing AS - All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.