Close Menu
    Facebook LinkedIn
    Geo365
    Facebook LinkedIn
    BESTILL Login ABONNÉR PÅ NYHETSBREV
    • Hjem
    • Anlegg og infrastruktur
    • Aktuelt
    • Bergindustri
    • Dyphavsmineraler
    • Miljø
    • Olje og gass
    • Geofunn
    • Download Media Guide
    Geo365
    You are at:Home » Produksjonen er i gang
    Olje og gass

    Produksjonen er i gang

    By Press Releasenovember 30, 2015
    Del denne artikkelen Facebook Twitter LinkedIn Email
    I løpet av helgen produserte Lundin den første oljen fra Edvard Grieg i Norskehavet.
    Edvard Grieg Illustrasjon: Lundin
    Facebook Twitter LinkedIn Email

    Alex Schneiter, President i Lundin Petroleum sier i en pressemelding: «I am extremely proud that we have delivered first oil from Edvard Grieg on schedule and on budget. This is a remarkable achievement by our Norwegian project team, our contractors and subcontractors that was made possible by the excellent support received from our partners and the government in Norway. I am particularly thankful to and proud of the people who discovered, executed the development of and are now operating the Edvard Grieg field in an exemplary way».
    Edvard Grieg ligger i PL338 på Utsira-høyden i Nordsjøen, omkring 180km vest for Stavanger. Feltet ble oppdaget i 2007, og det var Lundin’s første letebrønn på norsk sokkel.
    Feltet er estimert å inneholde 2P reserver med 187 millioner fat oljeekvivalenter. En vellykket appraisal-brønn ble boret sørøst for Edvarg Grieg-feltet tidligere i år, og er ventet å øke reservene på feltet.
    Direktør i Lundin Norway sier: «First oil from Edvard Grieg is a very proud moment for us all. The project execution capabilities proven by this delivery, coupled with the ingenuity of our exploration team, provide a hugely exciting platform for further growth in Norway».
    Fra arkivet:
    GEO 07/2014: Et år til oljen strømmer
    06.08.2015: Feilet i 40 år
    25.08.2015: Edvard Grieg blir mye større
    16.11.2015: Lundin får starte produksjon
    Fra pressemeldingen:
    The Edvard Grieg field has been developed with a steel jacket platform resting on the seabed. The topsides weigh about 22,500 tonnes and include a processing facility, utility module and living quarters. Most of the construction work took place in Norway, with Kværner as main contractor and a long list of Norwegian and foreign sub-contractors. The engineering was conducted by Aker Solutions, the living quarters and helicopter deck were delivered by Apply Leirvik, while the jacket was constructed at Kværner Verdal. The platform deck was built at Kværner Stord and Aker Solutions in Egersund. Statoil Petroleum has been responsible for construction and installation of the export pipelines.
    Development drilling with the Rowan Viking jack-up rig will resume shortly and a total of ten production wells and four water injection wells are planned to be drilled with plateau production expected during the second half of 2016. The drilling of the development wells is expected to continue into 2018.
    Edvard Grieg has been designed as a field centre, and will receive oil and gas from the neighbouring field Ivar Aasen for further processing. The oil is being transported via the Grane pipeline to the Sture terminal on the west coast of Norway, while gas will be transported via a separate pipeline system to St. Fergus in Scotland.

    Related Posts

    Betydelig funn i Sleipner-området

    desember 5, 2025

    Agents with alibis

    desember 3, 2025

    AI-powered production monitoring

    desember 3, 2025
    Add A Comment

    Comments are closed.

    NYHETSBREV
    Abonner på vårt nyhetsbrev
    geo365.no: ledende leverandør av nyheter og kunnskap som vedrører geofaget og geofaglige problemstillinger relatert til norsk samfunnsliv og næringsliv.
    KONFERANSER

    Mineralfunn langs Østgrønlandsryggen
    Dec 04, 2025

    Mineralfunn langs Østgrønlandsryggen

    Tre år med dypdykk – hva har vi lært?
    Dec 03, 2025

    Tre år med dypdykk – hva har vi lært?

    Fant ukjent oppkomme av gass
    Nov 27, 2025

    Fant ukjent oppkomme av gass

    Bjørkum og Rock-Eval-pyrolyse gjengir ikke det som skjer i kildebergarten
    Nov 27, 2025

    Bjørkum og Rock-Eval-pyrolyse gjengir ikke det som skjer i kildebergarten

    Fra klasserom til skredterreng i Troms 
    Nov 21, 2025

    Fra klasserom til skredterreng i Troms 

    Escaping the relentless cycle of re-orgs
    Dec 05, 2025

    Escaping the relentless cycle of re-orgs

    Natural hydrogen exploration offshore Southern Cuba
    Dec 05, 2025

    Natural hydrogen exploration offshore Southern Cuba

    New modelling study reveals a petroleum system overlying oceanic crust offshore Equatorial Guinea
    Dec 04, 2025

    New modelling study reveals a petroleum system overlying oceanic crust offshore Equatorial Guinea

    From scattered campfires to integrated cities: The future of energy software
    Dec 03, 2025

    From scattered campfires to integrated cities: The future of energy software

    Unlocking Egypt’s Western Desert: The next Eagle Ford?
    Dec 02, 2025

    Unlocking Egypt’s Western Desert: The next Eagle Ford?

    OLJEPRIS
    BCOUSD quotes by TradingView
    GULLPRIS
    GOLD quotes by TradingView
    KOBBERPRIS
    Track all markets on TradingView
    GeoPublishing AS

    GeoPublishing AS
    Trollkleiva 23
    N-1389 Heggedal

    Publisher & General Manager

    Ingvild Ryggen Carstens
    ingvild@geopublishing.no
    cell: +47 974 69 090

    Editor in Chief

    Ronny Setså
    ronny@geopublishing.no
    +47 901 08 659

    Media Guide

    Download Media Guide

    ABONNEMENT
    NYHETSBREV
    Abonner på vårt nyhetsbrev
    © 2025 GeoPublishing AS - All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.