Close Menu
    Facebook LinkedIn
    Geo365
    Facebook LinkedIn
    BESTILL Login ABONNÉR PÅ NYHETSBREV
    • Hjem
    • Anlegg og infrastruktur
    • Aktuelt
    • Bergindustri
    • Dyphavsmineraler
    • Miljø
    • Olje og gass
    • Geofunn
    • Download Media Guide
    Geo365
    You are at:Home » Important learnings from Darwin
    Olje og gass

    Important learnings from Darwin

    By Halfdan Carstensmars 4, 2016
    Del denne artikkelen Facebook Twitter LinkedIn Email
    The Darwin well in the Barents Sea (7218/11-1) has given some important learning points. Concedo will now share these in two April seminars.
    "Wathch out for change rocks!" That's one learning point that Concedo will relate to the oil community in the April Hydrocarbon Habitat seminars.
    Facebook Twitter LinkedIn Email

    «Charles Darwin is well known for the statement ‘survival of the fittest’. ‘Survival of the fittest’ may mean that those still curious, willing to learn and adjust to changing information and conditions will do well», says Geir Lunde, CEO of Concdedo.
    The compnay has selected some learning points after drilling the Darwin prospect on the Veslemøøy High in the Barents Sea. These are learning points that should be relevant when evaluating open acreage in the upcoming APA 2016. Lunde will go into detail about this in the Hydrocarbon Habitat seminars in Oslo April 5 and Stavanger April 7.
    See the programme.
    «In our initial interpretation leading up to the 20. Concession Round application in 2008 we saw the potential for a shallow Jurassic sequence within the Veslemøy High as a high potential/high risk opportunity,» Lunde says.
    With new data, however, especially the reprocessed TGS long cable data, it became more obvious that the Darwin well, 7218/11-1, would reach TD in Cretaceous rocks.
    «When the Darwin well was drilled in 2013 the targets were potential sandstones of Paleocene and Cretaceous age,» Lunde explains.
    The well was dry, but the geological knowledge about the Veslemøy High increased substantially. One of hte interesting facts is that the well proved about 130m of Turonian source rock that, however, was immature for hydrocarbon generation.
    Nevertheless, the main remaining potential within the PL 531 area is in Concedos opinion a large Jurassic structure.
    «Correct seismic tie of ‘Top Reservoir’, depth conversion, estimation of removed overburden and reservoir quality are important challenges,» Geir Lunde says.
    For more learnings, please join us in April.

    Related Posts

    Norges nye seismikkekspert

    mai 20, 2026

    Ingen topp i sikte

    mai 13, 2026

    Øyner muligheter i Mistral

    april 22, 2026
    Add A Comment

    Comments are closed.

    NYHETSBREV
    Abonner på vårt nyhetsbrev
    geo365.no: ledende leverandør av nyheter og kunnskap som vedrører geofaget og geofaglige problemstillinger relatert til norsk samfunnsliv og næringsliv.
    KONFERANSER

    Meteorittkrater: Torstrukturen
    May 22, 2026

    Meteorittkrater: Torstrukturen

    Bjørkum ignorerer hovedtemaet
    May 21, 2026

    Bjørkum ignorerer hovedtemaet

    Pensum møter praksis
    May 19, 2026

    Pensum møter praksis

    Fant rester av jordens opprinnelse  
    May 14, 2026

    Fant rester av jordens opprinnelse  

    Mounds, layers and sands of ore
    May 12, 2026

    Mounds, layers and sands of ore

    Until now, hydrogen exploration wells were drilled half-blind
    May 22, 2026

    Until now, hydrogen exploration wells were drilled half-blind

    The mood music of the E&P geoscience job market
    May 21, 2026

    The mood music of the E&P geoscience job market

    What are we risking and why is it important?
    May 21, 2026

    What are we risking and why is it important?

    “It is quite a risk hiring you”
    May 21, 2026

    “It is quite a risk hiring you”

    Keep that well
    May 20, 2026

    Keep that well

    OLJEPRIS
    BCOUSD quotes by TradingView
    GULLPRIS
    GOLD quotes by TradingView
    KOBBERPRIS
    Track all markets on TradingView
    GeoPublishing AS

    GeoPublishing AS
    Trollkleiva 23
    N-1389 Heggedal

    Publisher & General Manager

    Ingvild Ryggen Carstens
    ingvild@geopublishing.no
    cell: +47 974 69 090

    Editor in Chief

    Ronny Setså
    ronny@geopublishing.no
    +47 901 08 659

    Media Guide

    Download Media Guide

    ABONNEMENT
    NYHETSBREV
    Abonner på vårt nyhetsbrev
    © 2026 GeoPublishing AS - All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.